Permit planning is part of the project, not paperwork added at the end. The drawings describe what is being built, while inspections confirm work at stages that may later be hidden.
The correct application path depends on the proposed use and existing construction. A qualified review can help determine whether the project is a basement finish, alteration, new Additional Residential Unit or legalization of existing work.
Permit and Approval Services
Use the service that matches your current stage.
Permit Drawings
Document existing conditions and the proposed coordinated design.
Building Permit Applications
Prepare and submit the required application package.
Existing Basement Assessment
Review records, visible work and likely deficiency areas.
Inspection Coordination
Plan construction access and readiness around inspection stages.
ARU Registration
Complete the City registration process for the additional unit.
Rental Licensing
Understand the separate annual operating requirement.
How Permit Planning Connects to Construction
- Confirm the proposed useThe intended use determines the project type and the information required.
- Collect property informationExisting records, surveys and site conditions may affect the application.
- Prepare coordinated drawingsShow layouts, construction assemblies and building systems accurately.
- Complete application reviewRespond to municipal review comments before starting regulated work.
- Book inspections at the right timeDo not cover work that needs to be inspected.
- Close the permit and registration pathComplete final documents, deficiencies and approvals.
A permit is permission to build the approved design.
It is not a blanket approval for unrelated work or field changes. Changes that affect the approved plans may require revised documentation before proceeding.
Tell Us Where Your Project Stands
Share whether you have drawings, an application, an issued permit, an inspection concern or no documents yet.